Cairo International Airport Egypt, Terminal 3

Client Cairo Airport Company, Arabic Republic of Egypt
Project Manager Dar Al-Handasah, Cairo
Architect NACO Den Haag, Engineering Consultant Group, Den Haag
Structural Engineer NACO Den Haag, Engineering Consultant Group, Den Haag
Built-up Area 160,000 m2
Start Design 2004
Completion Project 2007

Project description

Design and construction of Terminal Building 3 to expand Cairo International Airport in Egypt. The terminal building will be capable of handling 11 million passenger per annum.The project also includes the design and construction of airside facilities such as passenger boarding bridges, fuelling, pre-conditioned air and power supply for aircraft.

Special details

 The project is partly financed by the World Bank.The baggage handling system includes safety checks and storage.The airside facilities are also suitable for A380 aircraft.The desert climate requires extra attention for climate control inside the building.

Involvement Deerns

 Draft and final design of mechanical, electrical en transport installations. Deerns was also responsible for tender documents, tendering and assistance during construction. Important issues are airport related special systems, aircraft gate services and climate control.